ambari-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hudson (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (AMBARI-7582) Upgrade Apache Rat version to 0.11 in pom.xml
Date Wed, 01 Oct 2014 13:36:34 GMT

    [ https://issues.apache.org/jira/browse/AMBARI-7582?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14154791#comment-14154791
] 

Hudson commented on AMBARI-7582:
--------------------------------

SUCCESS: Integrated in Ambari-trunk-Commit #438 (See [https://builds.apache.org/job/Ambari-trunk-Commit/438/])
AMBARI-7582 Upgrade Apache Rat version to 0.11 in pom.xml (dsen) (dsen: http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=9f9e64006e2f46ea7fd976c87f9558b2a56494f7)
* pom.xml
* contrib/views/pom.xml


> Upgrade Apache Rat version to 0.11 in pom.xml
> ---------------------------------------------
>
>                 Key: AMBARI-7582
>                 URL: https://issues.apache.org/jira/browse/AMBARI-7582
>             Project: Ambari
>          Issue Type: Task
>            Reporter: Dmytro Sen
>            Assignee: Dmytro Sen
>
> Apache Ambari projects consists from two big sub-projects: Ambari itself and contrib/views.
While trying to build Ambari or start tests, process hangs during rat check. As was found
a builded contrib/views generate a lot of node_modules files and this takes a lot of time
for rat to check them all (but they are disabled to check?). In rat version 0.11 was introduced
option -Drat.skip which could be used for technical builds and check which allows to speed-up
process.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message