Hi Suresh,

I have some comments inline.


On Mon, Dec 16, 2013 at 10:53 AM, Suresh Marru <smarru@apache.org> wrote:

> Hi All,
>
> This is a very good question. Lets discuss these options so we are
> consistent across releases.
>
> If we look at the way we are doing releases, we are calling a feature
> freeze and code freeze and cutting a release. Most of the time, our build
> is broken. Jenkins   statistics for Airavata is not looking good at all
> [1].


There is something wrong with the Jenkins configurations. I tried to figure
out sometime back I was unable to do so. Even though builds are successful
in our local machines they are failing intermittently in Jenkins.

We are barely fixing the build a day before the release, putting out an RC
> and testing on it and releasing it in a quick succession.


This is not entirely true. For the past few months I only experienced one
or two build breaks (maybe less). I build couple of times per week. I
believe usually build is stable and with integration tests passing, we
always get a workable version. I know its not a good practice not to rely
on the build server. But commiters have personal discipline to keep the
build stable. Nevertheless we must fix Jenkins configuration issue.


> As we are seeing on user lists, we have users upgrading with every
> release. I think we should increase the release quality.


+1 for this.


> I would vote for atleast 3 RC’s per release. If we are not finding issues
> in first RC, I would say, either the software has magically become too too
> good or we are not doing through testing. I suspect the later.
>

I guess you mentioned this under assumption that build is not stable.


>
> I will propose the following, please counter it and lets agree on a
> process:
>
> * Lets post a RC1 as is (which means it will have a snapshot). This pack,
> we should all test as much as possible, so its more of a test candidate
> then a release candidate. If it helps, we can use the name TC1. I am not
> particular on the naming but trying to emphasize the need for having
> atleast more RC's per release.
>

I am not sure whether we really need a TC. The release manager should be
doing some verifications on the RC before putting it out. Therefore it
should be a RC. Anyhow i am fine having TC concept and trying it out.

What we really need is set of verifiable test cases.

Thank you
Regards
Amila


>
> * If we do not expose significant issues in RC/TC 1 then we proceed with
> RC2 which will follow the proper release process. But if we have a
> reasonable issues bought out, we need a RC2/TC2 also without following the
> release process.
>
> * The key thing I am proposing is, we keep doing RC/TC’s until we all are
> sure the quality is good enough with documented known issues. When we are
> sure, then we proceed to have RC with proper release process.
>
> So this will mean more testing and twice (or more) the times every one has
> to test, but I think it is worth it. This might also get over the 6 week
> release cycle, but I think we need to trade for some quality releases as we
> march towards 1.0.
>
> Suresh
> [1] - https://builds.apache.org/job/Apache%20Airavata/
>
>
> On Dec 15, 2013, at 4:28 PM, Lahiru Gunathilake <glahiru@gmail.com> wrote:
>
> >
> > Hi Chathuri,
> >
> > I think having snapshot as the version in RC is wrong. Every RC has to
> be like a release and if it pass we just call a vote/discussion thread and
> do the release. If we do with snapshot  and if things go right, then have
> to change versions and test again. But we can do the release just by
> changing snapshot without testing but that wrong AFAIT.
> >
> > I remember doing this mistake in earlier release with RC1 build. I think
> we can stick to the release management instructions in airavata.org.
> >
> > Regards
> > Lahiru
> >
> >
> > On Fri, Dec 13, 2013 at 3:43 PM, Chathuri Wimalasena <
> kamalasini@gmail.com> wrote:
> > Hi All,
> >
> > Airavata 0.11 RC1[1] is ready for testing.
> >
> > Here are some pointers for testing
> >       • Verify the fixed issue for this release [2]
> >       • Verify the basic workflow composition/execution/monitoring
> scenarios from
> >       • Airavata 5 & 10 min tutorials [3],[4]
> >       • Verify airavata client samples
> >       • Verify the stability with derby & mysql backend databases
> >       • Verify that the XBaya JNLP distribution works
> >       • Verify deploying Airavata server in a tomcat distribution
> > Please report any issues[5] if you encounter while testing. Thank you
> for your time in validating the release.
> >
> > Regards,
> > Chathuri (On behalf of Airavata PMC)
> >
> > [1] https://dist.apache.org/repos/dist/dev/airavata/0.11/RC1/
> > [2]
> https://issues.apache.org/jira/browse/AIRAVATA-278?jql=project%20%3D%20AIRAVATA%20AND%20fixVersion%20%3D%20%220.11%22%20ORDER%20BY%20status%20DESC%2C%20priority%20DESC
> > [3]
> http://airavata.apache.org/documentation/tutorials/airavata-in-5-minutes.html
> > [4]
> http://airavata.apache.org/documentation/tutorials/airavata-in-10-minutes.html
> > [5] https://issues.apache.org/jira/browse/AIRAVATA
> >
> >
> >
> >
> >
> >
> > --
> > System Analyst Programmer
> > PTI Lab
> > Indiana University
>
>

Mime