ace-commits mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Marcel Offermans (JIRA)" <j...@apache.org>
Subject [jira] [Closed] (ACE-413) DP download could not be resumed if download was complete but DP not installed
Date Thu, 17 Apr 2014 08:57:00 GMT

     [ https://issues.apache.org/jira/browse/ACE-413?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Marcel Offermans closed ACE-413.
--------------------------------

    Resolution: Fixed

Closed all issues I just reopened and targeted for 'next' release.

> DP download could not be resumed if download was complete but DP not installed
> ------------------------------------------------------------------------------
>
>                 Key: ACE-413
>                 URL: https://issues.apache.org/jira/browse/ACE-413
>             Project: ACE
>          Issue Type: Bug
>          Components: Deployment
>    Affects Versions: 1.0.0
>            Reporter: Wilfried Sibla
>            Assignee: Marcel Offermans
>             Fix For: next
>
>
> If a DP could be downloaded compeletely but not installed (crash/restart of containe
etc.), it could not be continued with installing the DP.
> One reason: there is no check on startup if there already is a complete DB
> After asking the server for the new DP version and trying to complete the download (of
the DP which is already stored locally and complete), the server returns a http error 416.
> http range header could not be set to the total length of the stream.
> see [http://stackoverflow.com/questions/3303029/http-range-header]



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Mime
View raw message