accumulo-notifications mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Christopher Tubbs (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (ACCUMULO-2680) BackupMasterIT timing too tight
Date Mon, 21 Apr 2014 16:15:21 GMT

     [ https://issues.apache.org/jira/browse/ACCUMULO-2680?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Christopher Tubbs updated ACCUMULO-2680:
----------------------------------------

    Fix Version/s:     (was: 1.6.1)
                       (was: 1.7.0)
                   1.6.0

> BackupMasterIT timing too tight
> -------------------------------
>
>                 Key: ACCUMULO-2680
>                 URL: https://issues.apache.org/jira/browse/ACCUMULO-2680
>             Project: Accumulo
>          Issue Type: Sub-task
>          Components: test
>            Reporter: Josh Elser
>            Assignee: Eric Newton
>            Priority: Trivial
>             Fix For: 1.6.0
>
>
> BackupMasterIT just failed for me when it ran into the timeout of 10seconds. Inspecting
the logs did not give me any reason to suspect that it failed for any other reason than it
ran out of time.



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Mime
View raw message