accumulo-notifications mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hudson (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (ACCUMULO-1202) Add integration-test phase to maven build by using maven-failsafe-plugin
Date Sat, 13 Apr 2013 01:15:14 GMT

    [ https://issues.apache.org/jira/browse/ACCUMULO-1202?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13630849#comment-13630849
] 

Hudson commented on ACCUMULO-1202:
----------------------------------

Integrated in Accumulo-1.5 #77 (See [https://builds.apache.org/job/Accumulo-1.5/77/])
    ACCUMULO-1202 Add maven-failsafe-plugin execution to the build. No existing unit tests
are converted at this time. (Revision 1467503)

     Result = UNSTABLE
ctubbsii : 
Files : 
* /accumulo/branches/1.5/pom.xml

                
> Add integration-test phase to maven build by using maven-failsafe-plugin
> ------------------------------------------------------------------------
>
>                 Key: ACCUMULO-1202
>                 URL: https://issues.apache.org/jira/browse/ACCUMULO-1202
>             Project: Accumulo
>          Issue Type: Improvement
>    Affects Versions: 1.6.0
>            Reporter: David Medinets
>            Assignee: Christopher Tubbs
>             Fix For: 1.5.0
>
>
> On my VirtualBox Ubuntu server, the tests take six minutes to run. Let's add the failsafe
plugin so that we can move the long-running tests to the integration-test phase. See http://antoniogoncalves.org/2012/12/13/lets-turn-integration-tests-with-maven-to-a-first-class-citizen/
for details how to change the pom.xml. Renaming ShellServerTest and TestProxyTableOperations
to end in IT would reduce the test execution time by about 50% on my server.

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Mime
View raw message