Agreed on 1.5.1 (just sent out RC3). I can just update it if you'd like 
when I close out the Jira version.

re: lessons-learned, I think I have most (all?) of them documented 
already[1]. Things I didn't know I made a point to write down. That, 
coupled with the script that Christopher made, makes a pretty thorough 
guide, IMO. I'd defer to what Mike (he's the RM for 1.4.5, right?) thinks.

Personally, I haven't been looking heavily at 1.6.0 since mid-January, 
so I can't comment there either.

[1] http://accumulo.apache.org/releasing.html
On 2/24/14, 7:42 PM, Sean Busbey wrote:
> Right now, Jira lists the following scheduled release dates:
>
> * 1.5.1 : 2013-07-24
> * 1.4.5 : 2013-10-31
> * 1.6.0 : 2013-11-24
>
> I'd like to update these to reflect when we currently think things are
> likely to complete.
>
> Here's my WAG:
>
> * 1.5.1 : 2014-02-28
> * 1.4.5 : 2014-03-19
> * 1.6.0 : 2014-05-29
>
> My reasoning:
>
> * 1.5.1 RC2 failed due to a miscommunication, RC3 is unlikely to have issues
> * AFAIK, 1.4.5 still needs to go through most of the long run tests and
> that will take time. I'd like to wait to start until we have lessons from
> the 1.5.1 release in hand.
> * 1.6.0 still has a ton of tickets, that date is based on a net burn down
> rate of just over 1 per business day (after adjusting for the time it takes
> to do tests)
>
> Thoughts?
>
> -Sean
>