From Corey Nolet <cno...@texeltek.com>
Subject RE: Use pre-integration-test to start instamo, run tests in integration-test, then stop instamo in post-integration-test?
Date Thu, 21 Mar 2013 11:53:20 GMT
Would it also help to define the integration tests in a maven profile that hudson runs by default?
I just added some tests that use the mini cluster to verify that proper exceptions are being
thrown and it slows down the build as well.


Sent from my Verizon Wireless 4G LTE Smartphone

-------- Original message --------
From: David Medinets <david.medinets@gmail.com> 
Date: 03/21/2013  6:31 AM  (GMT-05:00) 
To: accumulo-dev <dev@accumulo.apache.org> 
Subject: Use pre-integration-test to start instamo, run tests in integration-test, then stop
instamo in post-integration-test? 
 
Running org.apache.accumulo.proxy.SimpleTest
Tests run: 3, Failures: 1, Errors: 0, Skipped: 0, Time elapsed: 37.844
sec <<< FAILURE!

I am continued to be concerned by this unit test in the proxy module.
And a few others that are long-running. I haven't found time to dig
into the code but I assume it is the issue related to spinning up the
Accumulo processes for the test. Could one instance of Instamo be spun
up during the pre-integration-test and spin down during
post-integration-test as stand-alone processes? Then any tests
associated with Instamo can be run inside the integration-test phase.

On Thu, Mar 21, 2013 at 1:59 AM, Apache Jenkins Server
<jenkins@builds.apache.org> wrote:
> See <https://builds.apache.org/job/Accumulo-Trunk-Hadoop-2.0/150/changes>
>