From David Medinets <david.medin...@gmail.com>
Subject Use pre-integration-test to start instamo, run tests in integration-test, then stop instamo in post-integration-test?
Date Thu, 21 Mar 2013 10:31:05 GMT
Running org.apache.accumulo.proxy.SimpleTest
Tests run: 3, Failures: 1, Errors: 0, Skipped: 0, Time elapsed: 37.844
sec <<< FAILURE!

I am continued to be concerned by this unit test in the proxy module.
And a few others that are long-running. I haven't found time to dig
into the code but I assume it is the issue related to spinning up the
Accumulo processes for the test. Could one instance of Instamo be spun
up during the pre-integration-test and spin down during
post-integration-test as stand-alone processes? Then any tests
associated with Instamo can be run inside the integration-test phase.

On Thu, Mar 21, 2013 at 1:59 AM, Apache Jenkins Server
<jenkins@builds.apache.org> wrote:
> See <https://builds.apache.org/job/Accumulo-Trunk-Hadoop-2.0/150/changes>
>